1) We have identified pixel-trigger tasks to be completed by February 2, 2002
- we have lots of tasks for the trigger group
- we would like the pixel group to finalize the design of the “pixel readout”
- we require hardware guidance from the DAQ group for the Level 1 buffer
2) The tasks address issues raised by the Technical Review of the BTeV Trigger
- queuing simulations and timing studies
- trigger code has not been run on a DSP or DSP simulator
-
3) The tasks DO NOT address control & monitoring, data integrity, robustness
- uncertain as to what is needed by February 2002
- we are certain that we can use help with this aspect of the pixel trigger